Quality control
Additional failures before a target cap
Turn a target damage rate into an absolute allowance for the remainder of a shipment period.
Remaining case allowance
cases
The example result is shown.
Worked example
Forecast total cohort size 5,600 ordersMaximum tolerated damage rate 1.3 %Damage cases already counted 50 orders
Remaining case allowance 22 cases
Calculation
floor(a × b ÷ 100) − c
- a
- Forecast total cohort size · orders
- b
- Maximum tolerated damage rate · %
- c
- Damage cases already counted · orders