ParcelBench
Quality control

Upper defect-rate estimate after zero failures

Estimate how large an underlying failure rate may still be compatible with an independent zero-failure audit.

Calculator inputs

One-sided upper bound at 95%

2.368096

%

The example result is shown.

Worked example

Independent packs with zero failures 125 packs

One-sided upper bound at 95% 2.368096 %

Calculation

100 × (1 − pow(0.05,1 ÷ a))

a
Independent packs with zero failures · packs