Returns & reuse
Reusable mailer daily-flow pool
Size a working pool of returnable mailers that spend time in dispatch, transit and return processing.
Estimated mailer pool size
mailers
The example result is shown.
Worked example
Average mails dispatched a day 85 mailers/dayAverage turnaround time 12 daysSpare pool allowance 18 %
Estimated mailer pool size 1,204 mailers
Calculation
ceil(a × b × (1+c ÷ 100))
- a
- Average mails dispatched a day · mailers/day
- b
- Average turnaround time · days
- c
- Spare pool allowance · %