Set carton reorder points that survive peak weeks
Start with an explicit inventory position, a defensible lead time and a reserve you can review after a late delivery.

Normalize the time basis
Keep separate usage histories for each carton stock code. Include samples and known repacks before dividing by the number of operating days if they consume ordinary stock. Measure lead time from the owner's reorder action through acceptance of usable goods. Align supplier and warehouse calendars. An eight-calendar-day shipment can be a different quantity of working demand around a holiday.
Set a clear trigger
A SKU with typical demand of 210 cartons per day, eight operating days of lead time and reserve of 540 cartons has a trigger of 2,220. Compare that with inventory position. For example, 2,700 usable pieces plus 1,200 scheduled receipts minus 970 allocated pieces and 300 other backorders leaves 2,630. Validate that the scheduled receipts can meet the need as expected, especially when late or awaiting quality release.
Place a case-rounded order
Choose a target position that reflects storage and purchasing constraints. For a target of 5,200, position of 2,630 and 250 pieces per supplier case, order 2,750 pieces if the target is your only constraint. Compare the post-order position with available space and any seasonal change in carton formats.
Review the assumptions after a miss
When a SKU stocks out, write down which assumption failed: demand, lead time, receipt quality, issue count, or timing between checks. Gather several events before replacing a sensible reserve. Confirm what alternate box codes are approved and what they change about protection, material cost and carrier billing.